Shaft dimensions that drifted during construction, a pit that holds water, a power supply that was never provisioned, or a delivery route that cannot take the components. We work to prevent those, which means being involved earlier than suppliers usually are.
| Stage | What happens |
|---|---|
| Survey | Assessment of shaft, structure, pit, headroom, power and access |
| Specification | Equipment selection against building constraints and requirements |
| Builder's work requirements | Written dimensions, tolerances and provisions issued to your contractors |
| Coordination | Ongoing liaison with civil, electrical, architectural and interior teams |
| Delivery and site handling | Getting the equipment to the shaft safely |
| Installation | Rails, machine, car, doors, controls and wiring |
| Testing and commissioning | Full-travel testing and verification of safety devices |
| Handover | Documentation, familiarisation and the maintenance plan |
Issued in writing at specification stage so your contractors can build to it.
| Item | Requirement |
|---|---|
| Shaft | Correct internal dimensions, plumb and within tolerance for the full travel |
| Pit | Correct depth, waterproofed, drained where required |
| Headroom | Clearance above the top served floor |
| Structure | Capacity for the equipment's static and dynamic loads |
| Machine space | Where the system requires one, with ventilation and access |
| Power | Correct supply, protection and earthing at the right point |
| Lighting and sockets | In pit, shaft and machine space as required |
| Access | A route capable of taking the largest component |
The single most common cause of delay is a shaft that was built to the drawing but drifted out of tolerance in construction, discovered only when installation begins. A dimensional check before equipment delivery avoids it.
Retrofits add constraints: working around occupants and ongoing operations, forming a shaft within existing structure, resolving fixed pit and headroom, managing noise, dust and access routes, and coordinating with building management on timings.
More of the programme is building work than elevator work. Plan accordingly.
At design stage, before the shaft is built. Dimensions, pit, headroom and power provision are far cheaper to design in than to correct.
Your contractor, to our written requirements. We coordinate and verify rather than build.
It is identified at the pre-delivery dimensional check. Depending on the deviation, it is corrected, or the specification is adjusted — which is why the check happens before equipment arrives.